Register · thresholded
Named plants at or above ~200 MW, plus a few smaller stations that define a system. Announced MW is outline, never a solid bar. Open the map →
| Plant | Where | Fuel | MW | Status | Owner |
|---|---|---|---|---|---|
| Robert-Bourassa Largest station in Canada. La Grande complex. | QC | hydro | 5,616 | operating | Hydro-Québec |
| La Grande-3 La Grande complex. | QC | hydro | 2,417 | operating | Hydro-Québec |
| La Grande-4 La Grande complex. | QC | hydro | 2,779 | operating | Hydro-Québec |
| La Grande-2-A La Grande complex, adjacent to Robert-Bourassa. | QC | hydro | 2,106 | operating | Hydro-Québec |
| La Grande-1 Downstream La Grande. | QC | hydro | 1,436 | operating | Hydro-Québec |
| Daniel-Johnson / Manic-5 Multiple-arch dam; Manicouagan. | QC | hydro | 1,596 | operating | Hydro-Québec |
| Beauharnois St. Lawrence run-of-river, west of Montréal. | QC | hydro | 1,903 | operating | Hydro-Québec |
| Romaine complex Four stations; Romaine-4 completed 2023. Point is complex centroid. | QC | hydro | 1,550 | operating | Hydro-Québec |
| Bersimis-1 Côte-Nord. | QC | hydro | 1,178 | operating | Hydro-Québec |
| Outardes-4 Manic-Outardes complex. | QC | hydro | 785 | operating | Hydro-Québec |
| Carillon Ottawa River. | QC | hydro | 753 | operating | Hydro-Québec |
| Sainte-Marguerite-3 Côte-Nord. | QC | hydro | 882 | operating | Hydro-Québec |
| Seigneurie de Beaupré Largest wind farm in Canada. | QC | wind | 364 | operating | Boralex / partners |
| Rivière-du-Moulin Second-largest wind farm in Canada. | QC | wind | 350 | operating | EDF Renewables |
| Apuiat Côte-Nord Innu partnership, Port-Cartier area. | QC | wind | 200 | operating | Innu / Boralex |
| Nicolas-Riou Bas-Saint-Laurent. | QC | wind | 224 | operating | EDF Renewables |
| Churchill Falls Operating station. 1969 contract replaced 17 Aug 2026; HQ firm take now framed to 2077. Expansion is a separate announced project. | NL | hydro | 5,428 | operating | CFLCo / HQ–NL Hydro DCIA |
| Muskrat Falls Lower Churchill. Feeds the Maritime Link. | NL | hydro | 824 | operating | NL Hydro |
| Bay d'Espoir Island system backbone. | NL | hydro | 604 | operating | NL Hydro |
| Holyrood Thermal Standby / residual thermal on the Avalon after Muskrat. | NL | oil | 490 | operating | NL Hydro |
| Gull Island Signed 17 Aug 2026. Target ~2036–37, ~12 TWh. Not operating. | NL | hydro | 2,700 | announced | NL Hydro / HQ DCIA |
| Churchill Falls expansion Existing-unit upgrades plus new capacity at the CF site. Agreed, not built. Offset from the operating station. | NL | hydro | 2,500 | announced | CFLCo / DCIA |
| Bruce NGS Eight CANDU units. MCR / life-extension in flight. | ON | nuclear | 6,232 | operating | Bruce Power / OPG assets |
| Darlington NGS Four units. Unit 4 back from refurb 2 Feb 2026. | ON | nuclear | 3,500 | operating | OPG |
| Pickering NGS B Units 5–8. Pickering A retired end-2024. B refurb through ~2034. | ON | nuclear | 2,064 | operating | OPG |
| Sir Adam Beck I & II Niagara. Includes the pump-generating station. | ON | hydro | 1,929 | operating | OPG |
| R.H. Saunders St. Lawrence, Cornwall. Shared with NYPA Moses. | ON | hydro | 1,045 | operating | OPG |
| Lennox GS Dual-fuel oil/gas peaker, Bath. | ON | oil | 2,100 | operating | OPG |
| Napanee GS Combined-cycle. | ON | gas | 900 | operating | Atura / OPG |
| Halton Hills GS Combined-cycle west of Toronto. | ON | gas | 683 | operating | Atura / OPG |
| Portlands Energy Centre Downtown Toronto gas. | ON | gas | 550 | operating | Atura / OPG |
| Atikokan GS Largest 100% biomass plant in North America; converted coal. | ON | biomass | 205 | operating | OPG |
| Oneida Energy Storage In-service 2025. Near Caledonia. | ON | storage | 250 | operating | Northland Power |
| Henvey Inlet Wind Among the largest wind farms in Ontario. | ON | wind | 300 | operating | Pattern / Henvey Inlet First Nation |
| Wolfe Island Wind Near Kingston. Just under the 200 MW naming line; kept as a landmark. | ON | wind | 198 | operating | Algonquin / affiliates |
| Darlington SMR Unit 1 BWRX-300. Licence to construct April 2025. Offset slightly from the CANDU station. | ON | nuclear | 300 | under construction | OPG |
| Darlington SMR Units 2–4 Outline only. Campus total ~1,200 MW if all four are built. | ON | nuclear | 900 | announced | OPG |
| Bruce C (new large nuclear) Pre-development / impact assessment. Not a plant. | ON | nuclear | 4,800 | announced | Bruce Power / OPG |
| Shepard Energy Centre Largest gas plant in Alberta. | AB | gas | 860 | operating | ENMAX / Capital Power |
| Genesee GS Off coal June 2024. All units gas-fired. | AB | gas | 1,386 | operating | Capital Power |
| Keephills GS Coal-to-gas converted. | AB | gas | 1,250 | operating | TransAlta / Capital Power |
| Sundance GS Remaining gas units after coal retirement. Capacity is remaining fleet, not historic nameplate. | AB | gas | 700 | operating | TransAlta |
| Sheerness GS Coal-to-gas converted. | AB | gas | 780 | operating | Heartland / ATCO |
| Battle River GS Coal-to-gas converted. | AB | gas | 689 | operating | Heartland Generation |
| Cascade Power Edson-area combined-cycle, in service 2024. | AB | gas | 900 | operating | Kineticor / partners |
| Travers Solar Largest solar farm in Canada (2023). | AB | solar | 465 | operating | Greengate |
| Dunmore Solar Cypress County. Anticipated around 2025–26. | AB | solar | 216 | under construction | DP Energy / partners |
| Whitla Wind Southeast Alberta. | AB | wind | 353 | operating | Capital Power |
| Castle Rock Ridge / downstream wind cluster Pincher Creek area. Cluster landmark. | AB | wind | 227 | operating | Enel / partners |
| Site C All six units in service 9 Aug 2025. ~5.1 TWh/year. | BC | hydro | 1,100 | operating | BC Hydro |
| W.A.C. Bennett / G.M. Shrum Williston Reservoir. Largest BC station. | BC | hydro | 2,730 | operating | BC Hydro |
| Peace Canyon Downstream of Bennett on the Peace. | BC | hydro | 694 | operating | BC Hydro |
| Mica Columbia. Columbia River Treaty context. | BC | hydro | 2,805 | operating | BC Hydro |
| Revelstoke Columbia. Unit 6 added 2021. | BC | hydro | 2,480 | operating | BC Hydro |
| Seven Mile Pend d'Oreille, near the US border. | BC | hydro | 805 | operating | BC Hydro |
| Bridge River Coastal interior cascade. | BC | hydro | 492 | operating | BC Hydro |
| Island Generation Campbell River gas. Reliability for Vancouver Island. | BC | gas | 275 | operating | Capital Power |
| Quality Wind Tumbler Ridge. Below 200 MW; kept as a Peace-region landmark. | BC | wind | 142 | operating | Capital Power |
| Limestone Nelson River. Largest MB station. | MB | hydro | 1,350 | operating | Manitoba Hydro |
| Keeyask In service 2021. Indigenous partnership. | MB | hydro | 695 | operating | Manitoba Hydro / Keeyask Hydropower LP |
| Kettle Nelson River. | MB | hydro | 1,228 | operating | Manitoba Hydro |
| Long Spruce Nelson River. | MB | hydro | 1,010 | operating | Manitoba Hydro |
| Grand Rapids Saskatchewan River. | MB | hydro | 479 | operating | Manitoba Hydro |
| Boundary Dam Includes Unit 3 CCS. Remaining coal is the SK story. | SK | coal | 672 | operating | SaskPower |
| Shand Estevan coal. | SK | coal | 276 | operating | SaskPower |
| Poplar River Coronach coal. | SK | coal | 582 | operating | SaskPower |
| Chinook Power Station Swift Current combined-cycle. | SK | gas | 350 | operating | SaskPower |
| Queen Elizabeth Saskatoon gas. | SK | gas | 634 | operating | SaskPower |
| Point Lepreau Only Atlantic nuclear station. | NB | nuclear | 660 | operating | NB Power |
| Belledune Coal; phase-out is the live NB argument. | NB | coal | 467 | operating | NB Power |
| Coleson Cove Residual oil, Saint John. | NB | oil | 972 | operating | NB Power |
| Mactaquac Saint John River. Life-achievement / rebuild decision outstanding. | NB | hydro | 670 | operating | NB Power |
| Lingan Cape Breton coal. Central to the coal-to-wind transition. | NS | coal | 620 | operating | NS Power |
| Point Aconi Cape Breton. Below 200 MW; kept as the coal fleet marker. | NS | coal | 165 | operating | NS Power |
| Tufts Cove Dartmouth gas/oil. | NS | gas | 415 | operating | NS Power |
| PEI wind fleet (North Cape / East Point cluster) Island generation is almost all wind. Point is a cluster centroid, not one farm. | PE | wind | 204 | operating | PEI Energy / Maritime Electric / IPPs |
| Whitehorse Rapids / Aishihik system Below threshold; the Yukon grid's hydro core. Winter peaks still need thermal. | YT | hydro | 92 | operating | Yukon Energy |
| Snare Hydro North Slave hydro. Isolated. | NT | hydro | 30 | operating | NTPC |
| Iqaluit diesel Territory-defining microgrid. Not bulk generation. | NU | oil | 16 | operating | Qulliq Energy |
| Iqaluit Nukkiksautiit Hydro 15–30 MW proposed. MPO-referred. Not operating. | NU | hydro | 30 | announced | Nukkiksautiit / Inuit-owned |