YT · Isolated northern hydro + thermal · 2023
A small hydro grid that already hits winter peaks hard enough to need thermal backup. Isolated from BC. Full dossier not in this edition.
| 2023 | 2026 | 2030 | 2035 | 2050 | |
|---|---|---|---|---|---|
| Generation TWh | 0.6 | 0.6 | 0.7 | 0.7 | 0.8 |
| End-use electricity TWh | 0.7 | 0.6 | 0.7 | 0.7 | 0.8 |
| Capacity GW | 0.2 | 0.2 | 0.2 | 0.2 | 0.2 |
| Gen − end-use TWh | -0.1 | -0.0 | -0.0 | -0.0 | -0.1 |
Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.
No bulk intertie. A Yukon–BC line is in pre-feasibility.
Above southern-Canada rates; far below Nunavut diesel.
Operator: Yukon Energy. Regulator: Yukon Utilities Board. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.
| Metric | 2023 | Note |
|---|---|---|
| Generation | 0.64 TWh | CER EF2026 |
| Capacity | 164.5 MW | includes storage where reported |
| End-use electricity | 0.7 TWh | converted from PJ |
| Net international exports | — | positive = export |
| Interprovincial in-flows | — | Quebec’s in-flow is mostly Churchill Falls |