YT · Isolated northern hydro + thermal · 2023

Yukon

A small hydro grid that already hits winter peaks hard enough to need thermal backup. Isolated from BC. Full dossier not in this edition.

Template locked · full dossier not in v2026.1 · hero numbers are live CER data
1
TWh generated
165 MW
capacity
89%
non-emitting
g CO2e/kWh (2022)
TWh net exports
HydroSolar
Hydro 0.5 TWh · 77%
Solar 0.1 TWh · 13%
Generation mix, 2023. Source: CER Energy Future 2026.

CER Current Measures — demand, generation, capacity

20232026203020352050
Generation TWh0.60.60.70.70.8
End-use electricity TWh0.70.60.70.70.8
Capacity GW0.20.20.20.20.2
Gen − end-use TWh-0.1-0.0-0.0-0.0-0.1

Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.

No bulk intertie. A Yukon–BC line is in pre-feasibility.

Above southern-Canada rates; far below Nunavut diesel.

Operator: Yukon Energy. Regulator: Yukon Utilities Board. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.

Numbers

Metric2023Note
Generation0.64 TWhCER EF2026
Capacity164.5 MWincludes storage where reported
End-use electricity0.7 TWhconverted from PJ
Net international exportspositive = export
Interprovincial in-flowsQuebec’s in-flow is mostly Churchill Falls