PE · Investor-owned, regulated (Maritime Electric / Fortis) · 2023

Prince Edward Island

A wind island that generates almost no thermal power of its own and lives on submarine cables to New Brunswick. Full dossier not in this edition.

Template locked · full dossier not in v2026.1 · hero numbers are live CER data
1
TWh generated
352 MW
capacity
99%
non-emitting
g CO2e/kWh (2022)
TWh net exports
Wind
Wind 0.5 TWh · 89%
Generation mix, 2023. Source: CER Energy Future 2026.

CER Current Measures — demand, generation, capacity

20232026203020352050
Generation TWh0.61.11.11.12.4
End-use electricity TWh1.92.02.12.43.2
Capacity GW0.40.50.60.71.4
Gen − end-use TWh-1.4-1.0-1.1-1.3-0.8

Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.

PEI–NB 300 MW in / 170 MW out.

Toward the higher end of provincial prices; most energy is imported.

Operator: Maritime Electric. Regulator: Island Regulatory and Appeals Commission. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.

Numbers

Metric2023Note
Generation0.56 TWhCER EF2026
Capacity351.9 MWincludes storage where reported
End-use electricity1.9 TWhconverted from PJ
Net international exportspositive = export
Interprovincial in-flows1.5 TWhQuebec’s in-flow is mostly Churchill Falls