PE · Investor-owned, regulated (Maritime Electric / Fortis) · 2023
A wind island that generates almost no thermal power of its own and lives on submarine cables to New Brunswick. Full dossier not in this edition.
| 2023 | 2026 | 2030 | 2035 | 2050 | |
|---|---|---|---|---|---|
| Generation TWh | 0.6 | 1.1 | 1.1 | 1.1 | 2.4 |
| End-use electricity TWh | 1.9 | 2.0 | 2.1 | 2.4 | 3.2 |
| Capacity GW | 0.4 | 0.5 | 0.6 | 0.7 | 1.4 |
| Gen − end-use TWh | -1.4 | -1.0 | -1.1 | -1.3 | -0.8 |
Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.
PEI–NB 300 MW in / 170 MW out.
Toward the higher end of provincial prices; most energy is imported.
Operator: Maritime Electric. Regulator: Island Regulatory and Appeals Commission. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.
| Metric | 2023 | Note |
|---|---|---|
| Generation | 0.56 TWh | CER EF2026 |
| Capacity | 351.9 MW | includes storage where reported |
| End-use electricity | 1.9 TWh | converted from PJ |
| Net international exports | — | positive = export |
| Interprovincial in-flows | 1.5 TWh | Quebec’s in-flow is mostly Churchill Falls |