NL · Vertically integrated Crown · 2023
Churchill Falls, Muskrat Falls, the Maritime Link — and as of 17 August 2026 a signed replacement for 1969. Gull Island is agreed, not built. Full dossier not in this edition.
| 2023 | 2026 | 2030 | 2035 | 2050 | |
|---|---|---|---|---|---|
| Generation TWh | 44.3 | 46.4 | 58.1 | 106.3 | 115.3 |
| End-use electricity TWh | 10.0 | 10.1 | 10.5 | 11.1 | 12.3 |
| Capacity GW | 8.8 | 8.8 | 12.5 | 23.6 | 26.3 |
| Gen − end-use TWh | 34.3 | 36.2 | 47.6 | 95.3 | 103.0 |
Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.
Churchill Falls → Quebec 5,428 MW today. DCIA (17 Aug 2026) replaces the 1969 contract, locks 6,915 MW firm to 2077, and adds Gull Island (2,700 MW) plus CF upgrades — construction, not operating MW. Maritime Link ↔ Nova Scotia ~475 MW.
Island rates still carry Muskrat Falls. Labrador is a different tariff world.
Operator: Newfoundland and Labrador Hydro. Regulator: Board of Commissioners of Public Utilities. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.
| Metric | 2023 | Note |
|---|---|---|
| Generation | 44.29 TWh | CER EF2026 |
| Capacity | 8,783.3 MW | includes storage where reported |
| End-use electricity | 10.0 TWh | converted from PJ |
| Net international exports | +1.6 TWh net export | positive = export |
| Interprovincial in-flows | 0.0 TWh | Quebec’s in-flow is mostly Churchill Falls |