NU · Diesel microgrids · 2023
Twenty-five diesel microgrids. No hydro, no ties, the highest rates in the country. Full dossier not in this edition.
| 2023 | 2026 | 2030 | 2035 | 2050 | |
|---|---|---|---|---|---|
| Generation TWh | 0.2 | 0.2 | 0.3 | 0.3 | 0.4 |
| End-use electricity TWh | 0.2 | 0.3 | 0.3 | 0.3 | 0.4 |
| Capacity GW | 0.1 | 0.1 | 0.1 | 0.1 | 0.1 |
| Gen − end-use TWh | -0.1 | -0.1 | -0.1 | -0.1 | -0.1 |
Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.
No interties. Iqaluit hydro is a proposed community-scale project, not a grid.
The expensive end of CER’s $83–$375 / 1,000 kWh range. Subsidies on a first block of kWh.
Operator: Qulliq Energy Corporation. Regulator: Utility Rates Review Council / Government of Nunavut. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.
| Metric | 2023 | Note |
|---|---|---|
| Generation | 0.20 TWh | CER EF2026 |
| Capacity | 95.8 MW | includes storage where reported |
| End-use electricity | 0.2 TWh | converted from PJ |
| Net international exports | — | positive = export |
| Interprovincial in-flows | — | Quebec’s in-flow is mostly Churchill Falls |