MB · Vertically integrated Crown · 2023
A hydro exporter on the Nelson River, more tightly tied to MISO than to Ontario. Full dossier not in this edition.
| 2023 | 2026 | 2030 | 2035 | 2050 | |
|---|---|---|---|---|---|
| Generation TWh | 33.4 | 32.3 | 31.6 | 32.4 | 36.7 |
| End-use electricity TWh | 22.0 | 22.0 | 22.4 | 23.4 | 26.6 |
| Capacity GW | 6.6 | 6.6 | 6.9 | 7.2 | 7.5 |
| Gen − end-use TWh | 11.3 | 10.3 | 9.2 | 9.0 | 10.1 |
Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.
Manitoba → US 2,858 MW; US → Manitoba 1,400 MW. Manitoba–Ontario only ~250 MW.
Among the lowest residential rates in Canada, with Quebec.
Operator: Manitoba Hydro. Regulator: Public Utilities Board of Manitoba. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.
| Metric | 2023 | Note |
|---|---|---|
| Generation | 33.37 TWh | CER EF2026 |
| Capacity | 6,554 MW | includes storage where reported |
| End-use electricity | 22.0 TWh | converted from PJ |
| Net international exports | +6.1 TWh net export | positive = export |
| Interprovincial in-flows | 0.0 TWh | Quebec’s in-flow is mostly Churchill Falls |