SK · Vertically integrated Crown · 2023
A thermal system (coal and gas) with a nuclear and CCS announcement stack. Full dossier not in this edition.
| 2023 | 2026 | 2030 | 2035 | 2050 | |
|---|---|---|---|---|---|
| Generation TWh | 24.9 | 23.5 | 24.7 | 26.4 | 34.2 |
| End-use electricity TWh | 21.4 | 22.1 | 23.8 | 25.6 | 31.6 |
| Capacity GW | 5.3 | 6.1 | 7.2 | 8.0 | 14.6 |
| Gen − end-use TWh | 3.5 | 1.4 | 0.9 | 0.8 | 2.6 |
Same workbook for every jurisdiction. Residual ≠ surplus. Source: CER EF2026.
Weak ties: 150 MW to Alberta, 150 MW to the US, 175–325 MW with Manitoba.
Toward the higher end of provincial residential prices.
Operator: SaskPower. Regulator: Saskatchewan Rate Review Panel / cabinet. This page will take the same skeleton as Quebec, Ontario, Alberta, and B.C. without a redesign.
| Metric | 2023 | Note |
|---|---|---|
| Generation | 24.90 TWh | CER EF2026 |
| Capacity | 5,275 MW | includes storage where reported |
| End-use electricity | 21.4 TWh | converted from PJ |
| Net international exports | +0.6 TWh net export | positive = export |
| Interprovincial in-flows | 2.0 TWh | Quebec’s in-flow is mostly Churchill Falls |